环氧地坪漆一般施工方法:一、环氧地坪表面的处理1、新竣工的工业环氧地坪必须经过一定的养护后方可施工,约28天。2、清除表面的水泥浮浆、旧漆以及粘附的垃圾杂物。3、彻底清除表面的油污,用克油王清洗剂处理。4、清除积水,并使潮处彻底干燥。5、表面的清洁需用无尘清扫机及大型吸尘器来完成。6、平整的表面允许空隙为2~2.5mm,含水量在6%以下,PH值6~80。7、地坪表面的打毛,需用无尘打磨机来完成,并用吸尘器彻底清洁。8、对地坪表面的洞孔和明显凹陷处应用腻子来填补批刮,实干后,打磨吸尘。
General construction methods of floor paint: 1. Floor surface treatment 1. The newly completed industrial floor must be maintained before construction, about 28 days. 2, remove the surface of cement slurry, old paint and adhesion of garbage debris. 3. Thoroughly remove the oil from the surface and use the king oil cleaner. 4, clear up the water and make the tide completely dry. 5, surface cleaning must be done with dust-free sweeper and large vacuum cleaner. 6. The smooth surface allows 2 to 2.5mm voids, and the water content is below 6%, pH 6~80. 7. The surface of the floor must be finished with a dust-free grinding machine and thoroughly cleaned with a vacuum cleaner. 8. Use putty to fill and scrape holes and obvious depressions on the surface of the floor. After dry, grind and dust.
二、涂饰封闭涂料
Two, finishing the closed coatings
1、在处理清洁、平整的砼表面,采用高压无气喷涂或辊涂,环氧封闭底涂料一道。
1. In the treatment of clean, flat concrete surface, the use of high-pressure airless spraying or roller coating, epoxy sealed primer together.
2、环氧封闭漆有很强的渗透性,在涂刷底漆时应加入一定量的稀释剂,使稀释后的底漆能渗入基层内部,增强涂层和基层的附着力,其涂布必须连续,不得间断,涂布量以表面刚好饱和为准。
2. Epoxy sealing paint has very strong permeability. A certain amount of diluent should be added to the primer to make the diluted primer penetrate into the interior of the base layer and enhance the adhesion of the coating and the base layer. The coating must be continuous and uninterrupted. The coating amount should be based on the surface saturation.
3、局部漏涂可用刷子补涂,表面多余的底漆必须在下道工序施工前打磨处理好。
3. Partial leakage can be repaired by brush. Surface redundant primer must be polished before the next process.
三、批刮批刮料
Three. Batch scraping batch scraping.
1、在实干(25℃,约4小时)以后的底漆表面采用两道批刮腻子的方法,以确保地坪的耐磨损、耐压性、碰撞、水、矿物油、酸碱溶液等性能,并调整地面平整度。 2、用100~200目的石英砂和环氧批刮料,作为第1道腻子,要充分搅拌均匀、刮平,此道主要用于增强地面的耐磨及抗压性能。
1. Two batches of scraping putty are used on the surface of the primer after drying (25 C, about 4 hours) to ensure the performance of the floor, such as wear resistance, pressure resistance, collision, water, mineral oil, acid and alkali solution, and to adjust the surface smoothness. 2. Using 100-200 mesh quartz sand and epoxy batch scraping material as the first putty, it is necessary to mix well and scrape flat. This method is mainly used to enhance the wear resistance and compression resistance of the ground.
3、用砂袋式无尘滚动磨砂机打磨第1道腻子,并吸尘清洁。
3, use sandbag type dust-free rolling mill to polish first putty and clean it.
4、用200—270目的石英砂和环氧批刮料,作为第1道腻子,要充分搅拌均匀、刮平,此道主要用于增强地面的耐磨及平整度。
4. Using 200-270 mesh quartz sand and epoxy batch scraping material as the first putty, it is necessary to mix well and scrape flat, which is mainly used to enhance the wear resistance and smoothness of the ground.
5、用砂袋式无尘滚动磨砂机打磨第2道腻子,并吸尘清洁。
5, use sandbag type dust-free rolling mill to polish second putty and clean it.
6、两道腻子实干以后,如有麻面、裂缝处应先进行修补,然后用平板砂光机进行打磨,使其平整,并吸尘清洁。
6. After the two putty dry, if there are pockmarks, cracks should be first repaired, and then use a flat sander to grind, make it flat, and clean dust.
7、石英砂使用目数由现场工程师根据地面具体情况确定。
7. The number of quartz sand used is determined by the field engineer according to the specific conditions of the ground.
四、涂饰地坪中间层
Four, finishing the middle floor of the floor.
1、在打磨、清洁后的腻子表面上(20℃,24小时)用环氧地坪涂料涂饰中间层,涂饰方法可用刷涂、批刮、高压无空气喷涂,大面积施工以高压无空气喷涂为最佳,喷涂压力为20~25Mpa。
1. Use epoxy floor coating to finish the middle layer on the polished and cleaned putty surface (20 C, 24 hours). The coating method can be brushed, scraped, high-pressure air-free spraying. High-pressure air-free spraying is the best for large-area application, and the spraying pressure is 20-25 Mpa.
2、此遍可使地面更趋于平整,更便于发现地面仍存在的缺陷,以便下一面层施工找平。
2. This time can make the ground more leveled, and it is more convenient to find the defects of the ground, so as to leveling the construction of the next layer.
3、此遍还方便甲方对设备安装等的安排。
3, it is also convenient for Party A to arrange equipment installation and so on.
五、涂饰地坪面层
Five. Finishing floor surface
1、在中间层实干后,进行环氧地坪层涂装,涂装方法用批刮和高压无空气喷涂,但以高压无空气喷涂为宜。
1. After the middle layer is dry, the epoxy floor coating is carried out. The coating method is batch scraping and high-pressure air-free spraying, but the high-pressure air-free spraying is suitable.
2、涂装前应对于中间层用砂袋式无尘滚动磨砂机进行打磨、吸尘。
2, before painting, sandbags and dust-free roller grinders in the middle layer shall be ground and vacuumed.
3、如甲方在中间层实干后,先进行了设备的安装调试,造成地面形成新的缺陷,应用批刮料找平、打磨,并吸尘、清洁后喷涂面层。
3. For example, after Party A has done the installation and debugging of the equipment in the middle layer, new defects are formed on the ground, which are leveled and polished by batch scraping material, and sprayed on the surface layer after dust collection and cleaning.
六、施工注意事项
Six. Matters needing attention in construction
1、施工现场的环境温度应高于5℃,相对湿度小于85%时方能施工。
1. The ambient temperature of the construction site should be higher than 5 degrees C. when the relative humidity is less than 85%, the construction can be carried out.
2、施工者应做好施工部位、时间、温度、相对湿度、地坪表面处理、材料等实际记录,以备查考。
2. The builder should make a good record of the construction site, time, temperature, relative humidity, surface treatment of the floor, materials and so on for reference.
3、涂料施工后,应立即清洗有关设备和工具。
3. After coating construction, the equipment and tools should be cleaned immediately.
环氧砂浆地坪漆施工方法:
Construction method of epoxy mortar floor paint:
1、基层处理:
1, grass-roots treatment:
清除地面浮浆、泥土、水泥翻沫及其它污染物,保证地面与底油附着结实。
Remove floated slurry, soil, cement and other pollutants to ensure that the ground and bottom oil are firm and firm.
2、底油施工:
2. Bottom oil construction:
将地表封闭,让底油充分渗透地面,增强附着力,促使面涂平整光滑。
The surface is closed, so that the bottom oil can fully penetrate the ground, enhance adhesion, and make the surface coating smooth and smooth.
在底油施工前应进行地面含水率的测定,如果含水率高于5%,则应进行断水处理或地面应再保养,达到含水率要求后再施工。
The ground water content should be measured before the bottom oil construction. If the water content is higher than 5%, the water cut should be treated or the ground should be re-maintained, and the water content should be met before the construction.
底油施工时将材料按比例充分搅拌均匀,用滚涂或用刮片刮涂于素地
When the bottom oil is constructed, mix the material evenly in proportion, and apply it to the plain by rolling or scraping.
要均匀有光泽,不均匀处理进行第二次补涂。一般24小时后可做中涂。
It should be evenly glossy and uneven for second times. Generally, it can be painted in 24 hours.
3、中涂施工:
3. Middle coating construction:
对地面较差或凹凸不平处进行批补施工。待底油固化后进行中涂批补,
Carry out batches of construction for poor or uneven ground. After the bottom oil is solidified, it will be mended.
将批补材料按比例混合,并充分搅拌均匀。燥后全面砂磨,再以吸尘器吸除 干净,做好面涂之准备。
Mix batching materials proportionally and mix well. After drying, sand milling is done, and then vacuum cleaner is used to clean and prepare for surface coating.
4、面涂施工:
4, surface coating construction:
待中涂固化后将调配好的面层涂料倒在地面上,用镘刀均匀摊布,摊布 次数不得太多,以免出现大量的气泡和刮痕。
After curing, pour the prepared surface coating on the ground and spread it evenly with a trowel. The spread times should not be too many to avoid a large number of bubbles and scratches.
5、面涂保养:
5, surface coating maintenance:
面涂施工完成两天内禁止上人,7天以内不可与水、酸、碱等化学物品接触,
During the two day period, no person should be allowed to be exposed to the surface coating, and should not be exposed to chemicals such as water, acid or alkali within 7 days.
若不慎沾涂,应立即用干布擦干净。
If you smear it carelessly, wipe it immediately with a dry cloth.
注:以上为环氧树脂地坪基本施工工艺。根据环氧树脂地坪的不同再增加 其它相应的施工工序。
Note: the above is the basic construction technology of epoxy resin floor. According to the difference of epoxy resin floor, additional other construction procedures are added.
对素地的要求 表面干燥,含水率小于8%,表面无起沙、粉化、空鼓、龟裂现象,基层素地要有防水层(原有素地已施工)。
The surface of vegetable land is required to be dry, with moisture content less than 8%. There is no sand, pulverization, empty drum or cracking on the surface. The grass-roots vegetable land should have a waterproof layer (the original vegetable land has been constructed).